ST. LOUIS BARNDOMINIUM BUILDERS / CORE

Instant Barndominium Estimate for the St. Louis Ring

Answer five questions and see a range for your project — built from the same planning bands published on the cost guide, with the county's permit adders and a site package you choose. No email. No phone number. Nothing leaves your browser unless you download the brief and send it to us.

MODEL 0.1 / PLANNING RANGE

What could your barndominium cost?

Estimated project range · excludes land
      Get a Quote →

      Planning range from published St. Louis-ring bands, model v0.1. Excludes land, surveys, allowance overages, outbuildings and utility line-extension charges beyond the utility's free footage. The written estimate after a site and county check is exact.

      The five inputs

      1. Living area, square feet (0–6,000) — the finished home.
      2. Shop area, square feet (0–8,000) — bays, garage, workshop. Finished or shell.
      3. Scope: Shell (posts, steel, doors and windows, no slab) · Dry-in (shell plus slab and exterior openings) · Turnkey (finished home; shop finished or shell).
      4. County: Franklin · Jefferson · Warren · Lincoln · St. Charles · Other — sets the permit and septic-permit allowance, and shows the county's minimums (five acres in Jefferson and St. Charles; three in Warren; St. Charles's 800-square-foot minimum dwelling).
      5. Site package: None (prepared site, utilities in) · Typical (septic, well, driveway and entrance, electric within Ameren's free footage, clearing and grading — $30,000–$80,000) · Extended (long driveway, line extension, difficult septic — $60,000–$120,000).

      What you get

      • A low-to-high total and a blended per-square-foot figure.
      • The drivers: shell/dry-in/turnkey band × footprint or living area, shop band × shop area, the county's adder with its label, the site package.
      • Notes that apply: the Farm Credit ten-acre rule; a tall-shop-bay adder above 1,200 square feet of shop; the St. Charles minimum-dwelling note.
      • A downloadable brief (text or PDF) with your inputs and range, to attach to the quote form.

      What the estimate cannot know

      Your soil (which decides the septic system within the site package), the distance to power, rock in the post holes, allowance choices, custom spans or eave heights, and the county's unpublished fee tables. The written estimate after the county and site check is exact and good for 30 days.

      Reference bands (2026, St. Louis ring)

      Scope Per sq ft
      Shell (footprint) $45 – $65
      Dry-in with slab (footprint) $60 – $85
      Turnkey living area $160 – $230
      Finished shop area $55 – $80
      Shop as shell $45 – $65
      Tall shop bay (12–16 ft eave) +$4 – $8
      County adder Allowance
      Franklin ($25 app + sq-ft fee + $350 escrow + sewer permit) $1,000 – $1,900
      Jefferson (fee on ≥ $120/sq ft valuation) $1,000 – $2,500
      Warren ($150 + $200 + $10) $360
      Lincoln (no county building permit; Health Dept septic) $0 – $300
      St. Charles (fee basis unverified) $800 – $2,000

      Site package: typical $30,000–$80,000; extended $60,000–$120,000. Example: 2,000 sq ft living + 1,200 sq ft finished shop, turnkey, typical site, Lincoln County = $416,000–$636,300.

      Next step

      Happy with the range? Get a quote — attach the brief and the parcel, and we start the county check. Want to understand the lines first? The cost guide · comparing builder bids.

      Written scope. Itemized estimate. No deposit until the county says yes.